Fields / 2/1-17 S
2/1-17 S
Exploration, wildcatPlugged and abandonedOil
Drilled by Aker BP ASA with Maersk Interceptor, 30.08.2019 to 08.11.2019 (70 days), to 4 390,0 m in the Tyne Group.
Water depth65,5 m
Total depth4 390,0 m MD
Vertical depth4 379,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table56,4 m
Formation at total depthTyne Group
RigMaersk Interceptor
Spud30.08.2019
Completed08.11.2019
OperatorAker BP ASA
Position56,8184 N, 3,1388 E
Formations
28 tops reported, measured depth in metres.
Temperature
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 2/1-5 | 4,7 | 4 454,0 | 157 °C | 2,13 | 1982 |
| 2/1-11 | 5,2 | 4 725,0 | 167 °C | 2,06 | 1997 |
| 2/1-9 | 5,7 | 4 298,0 | 160 °C | 1,73 | 1991 |
| 2/1-9 A | 5,7 | 4 379,0 | 138 °C | 1,62 | 1992 |
| 2/1-7 | 5,8 | 5 464,0 | 178 °C | 1,96 | 1984 |
| 2/1-13 S | 6,9 | 4 435,0 | 161 °C | 2,04 | 2008 |
| 2/1-1 | 7,9 | 4 178,0 | 126 °C | - | 1972 |
| 2/1-U-15 | 8,5 | - | - | - | - |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 20" | 586,0 | 26" | 591,0 | 1,88 FIT |
| Surface casing | 13 3/8" | 2 507,0 | 16" | 2 512,0 | 1,88 LOT |
| Liner | 9 7/8" | 3 959,0 | 12 1/4" | 3 966,0 | 2,23 LOT |
| Open hole | - | 4 380,0 | 8 1/2" | 4 380,0 | - |