Fields / 2/1-7
2/1-7
Exploration, wildcatPlugged and abandonedDry
Drilled by BP Petroleum Dev. of Norway AS with Glomar Moray F.i, 06.09.1984 to 06.03.1985 (181 days), to 5 464,0 m in the Rotliegend Group.
Water depth69,0 m
Total depth5 464,0 m MD
Vertical depth5 464,0 m TVD
Bottom-hole temperature178 °C
Max inclination-
Rotary table38,0 m
Formation at total depthRotliegend Group
RigGlomar Moray F.i
Spud06.09.1984
Completed06.03.1985
OperatorBP Petroleum Dev. of Norway AS
Position56,8643 N, 3,0945 E
Formations
31 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 178 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 2/1-9 | 0,7 | 4 298,0 | 160 °C | 1,73 | 1991 |
| 2/1-9 A | 0,7 | 4 379,0 | 138 °C | 1,62 | 1992 |
| 2/1-8 | 3,6 | 4 151,0 | 160 °C | 1,69 | 1985 |
| 2/1-U-9 | 3,6 | 129,0 | - | - | 1987 |
| 2/1-U-7 | 3,7 | 77,5 | - | - | 1987 |
| 2/1-U-5 | 3,7 | 62,0 | - | - | 1987 |
| 2/1-U-11 | 4,5 | 103,0 | - | - | 1987 |
| 2/1-U-6 | 4,5 | 75,6 | - | - | 1987 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 171,0 | 36" | 171,0 | - |
| Surface casing | 20" | 745,0 | 26" | 755,0 | 1,70 LOT |
| Intermediate | 13 3/8" | 2 473,0 | 17 1/2" | 2 490,0 | 1,92 LOT |
| Intermediate | 9 5/8" | 3 873,0 | 12 1/4" | 3 878,0 | 2,12 LOT |
| Liner | 7" | 5 076,0 | 8 1/2" | 5 464,0 | 2,20 LOT |
Mud weight
98 measurements, one dot each, 1,00 to 1,96 g/cm³ against measured depth, water based.