Fields / Gyda / 2/1-9 A
2/1-9 A
Exploration, appraisalPlugged and abandonedOil
Drilled by BP Norway Limited U.A. with Ross Isle in Gyda, 18.01.1992 to 08.03.1992 (50 days), to 4 379,0 m in the Ula Formation.
Water depth66,0 m
Total depth4 379,0 m MD
Vertical depth4 124,0 m TVD
Bottom-hole temperature138 °C
Max inclination60,0°
Rotary table23,0 m
Formation at total depthUla Formation
RigRoss Isle
Spud18.01.1992
Completed08.03.1992
OperatorBP Norway Limited U.A.
Position56,8605 N, 3,0847 E
Formations
26 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 138 °C |
| Gyda gradient | 37,0 °C/km |
| Estimated at total depth from the gradient | 153 °C |
The gradient is the median of 6 released wells in Gyda with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 2/1-9 same well | 0,0 | 4 298,0 | 160 °C | 1,73 | 1991 |
| 2/1-7 | 0,7 | 5 464,0 | 178 °C | 1,96 | 1984 |
| 2/1-U-9 | 4,0 | 129,0 | - | - | 1987 |
| 2/1-U-7 | 4,0 | 77,5 | - | - | 1987 |
| 2/1-U-5 | 4,0 | 62,0 | - | - | 1987 |
| 2/1-8 | 4,2 | 4 151,0 | 160 °C | 1,69 | 1985 |
| 2/1-U-11 | 4,9 | 103,0 | - | - | 1987 |
| 2/1-U-6 | 4,9 | 75,6 | - | - | 1987 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 164,0 | 36" | 165,0 | - |
| Intermediate | 20" | 895,0 | 26" | 896,0 | - |
| Intermediate | 13 3/8" | 2 893,0 | 17 1/2" | 2 895,0 | - |
| Intermediate | 9 5/8" | 3 938,0 | 12 1/4" | 3 940,0 | - |
| Liner | 7" | 4 378,0 | 8 1/2" | 4 385,0 | - |
Mud weight
11 measurements, one dot each, 1,50 to 1,62 g/cm³ against measured depth, oil based.