Fields / Visund / 34/8-13 A

34/8-13 A

Exploration, appraisalPlugged and abandonedOil

Drilled by StatoilHydro Petroleum AS with Scarabeo 5 in Visund, 17.03.2009 to 13.05.2009 (57 days), to 3 852,0 m in the Statfjord Group.

Water depth380,0 m
Total depth3 852,0 m MD
Vertical depth3 132,7 m TVD
Bottom-hole temperature-
Max inclination62,5°
Rotary table25,0 m
Formation at total depthStatfjord Group
RigScarabeo 5
Spud17.03.2009
Completed13.05.2009
OperatorStatoilHydro Petroleum AS
Position61,4044 N, 2,5811 E

Formations

24 tops reported, measured depth in metres.

GroupsNordland Group, top 405,0 mNordland GpHordaland Group, top 1 217,0 mHordaland GpRogaland Group, top 1 857,0 mRogaland GpShetland Group, top 2 050,0 mShetland GpCromer Knoll Group, top 3 326,0 mViking Group, top 3 349,0 mBrent Group, top 3 414,0 mDunlin Group, top 3 466,0 mDunlin GpStatfjord Group, top 3 735,0 mStatfjord GpFormationsUtsira Formation, top 1 120,0 mUtsira FmBalder Formation, top 1 857,0 mSele Formation, top 1 905,0 mLista Formation, top 1 929,0 mLista FmJorsalfare Formation, top 2 050,0 mJorsalfare FmKyrre Formation, top 2 277,0 mKyrre FmTryggvason Formation, top 3 045,0 mTryggvason FmÅsgard Formation, top 3 326,0 mDraupne Formation, top 3 349,0 mIntra Draupne Fm Ss, top 3 381,0 mTarbert Formation, top 3 414,0 mNess Formation, top 3 443,0 mDrake Formation, top 3 466,0 mCook Formation, top 3 495,0 mAmundsen Formation, top 3 593,0 mAmundsen Fm4051 0002 0003 0003 852

Temperature

Reported at total depth-
Visund gradient39,6 °C/km
Estimated at total depth from the gradient112 °C

The gradient is the median of 12 released wells in Visund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
34/8-13 S same well0,04 442,0-1,612009
34/8-U-10,0633,0--2009
34/8-31,93 328,0122 °C1,701988
34/8-3 A1,93 230,0116 °C1,711988
34/8-B-1 AH3,05 405,0--2002
34/8-B-1 H3,03 280,0--1999
34/8-B-2 H3,14 880,0--2001
34/8-17 S3,44 587,0-1,782014

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"465,036"468,0-
Pilot hole-725,09 7/8"725,0-
Surface casing20"1 324,026"1 324,01,60 LOT
Intermediate9 5/8"2 942,012 1/4"2 948,01,80 LOT
Open hole-3 852,08 1/2"3 852,0-

Mud weight

13 measurements, one dot each, 1,30 to 1,61 g/cm³ against measured depth, kcl/polymer, kill fluid- sw/bentonite, xp-07 - #14.

1,31,41,51,61,701 0002 0003 000968,0 m: 1,30 g/cm³, KCl/Polymer1 324,0 m: 1,48 g/cm³, XP-07 - #141 330,0 m: 1,30 g/cm³, KCl/Polymer1 330,0 m: 1,41 g/cm³, XP-07 - #141 330,0 m: 1,30 g/cm³, KCl/Polymer1 330,0 m: 1,30 g/cm³, Kill Fluid- SW/Bentonite1 397,0 m: 1,41 g/cm³, XP-07 - #142 345,0 m: 1,48 g/cm³, XP-07 - #142 617,0 m: 1,49 g/cm³, XP-07 - #142 948,0 m: 1,49 g/cm³, XP-07 - #143 439,0 m: 1,61 g/cm³, XP-07 - #143 852,0 m: 1,61 g/cm³, XP-07 - #143 853,0 m: 1,61 g/cm³, XP-07 - #14