Fields / Visund / 34/8-3
34/8-3
Exploration, appraisalPlugged and abandonedOil and gas
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Visund, 14.07.1988 to 14.09.1988 (62 days), to 3 328,0 m in the Statfjord Group.
Water depth382,0 m
Total depth3 328,0 m MD
Vertical depth3 320,0 m TVD
Bottom-hole temperature122 °C
Max inclination9,6°
Rotary table23,0 m
Formation at total depthStatfjord Group
RigPolar Pioneer
Spud14.07.1988
Completed14.09.1988
OperatorNorsk Hydro Produksjon AS
Position61,4078 N, 2,5459 E
Formations
23 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 122 °C |
| Drill-stem test at 2 947,0 m | 109 °C |
| Visund gradient | 39,6 °C/km |
| Estimated at total depth from the gradient | 119 °C |
The gradient is the median of 12 released wells in Visund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 34/8-3 A same well | 0,0 | 3 230,0 | 116 °C | 1,71 | 1988 |
| 34/8-U-1 | 1,9 | 633,0 | - | - | 2009 |
| 34/8-13 A | 1,9 | 3 852,0 | - | 1,61 | 2009 |
| 34/8-13 S | 1,9 | 4 442,0 | - | 1,61 | 2009 |
| 34/8-B-1 AH | 2,8 | 5 405,0 | - | - | 2002 |
| 34/8-B-1 H | 2,8 | 3 280,0 | - | - | 1999 |
| 34/8-B-2 H | 2,9 | 4 880,0 | - | - | 2001 |
| 34/8-C-2 AH | 3,8 | 5 081,0 | - | - | 2014 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 491,0 | 36" | 970,0 | - |
| Intermediate | 13 3/8" | 1 302,0 | 17 1/2" | 1 317,0 | 1,63 LOT |
| Intermediate | 9 5/8" | 2 598,0 | 12 1/4" | 2 622,0 | 1,86 LOT |
| Liner | 7" | 3 312,0 | 8 1/2" | 3 328,0 | - |
Mud weight
49 measurements, one dot each, 1,00 to 1,70 g/cm³ against measured depth, water based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 3 | 2 868,0 - 2 880,0 | 25,4 | - | 110 | 554 | 1 540 000 |
| 2 | 2 905,0 - 2 921,0 | 28,6 | - | 110 | 613 | 1 540 000 |
| 1 | 2 935,0 - 2 947,0 | 4,8 | - | 109 | 68 | 18 200 |