34/8-U-1
Other, shallow gasPlugged and abandoned
Drilled by StatoilHydro Petroleum AS with Scarabeo 5 in Visund, 14.03.2009 to 16.03.2009 (2 days), to 633,0 m.
Water depth381,0 m
Total depth633,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigScarabeo 5
Spud14.03.2009
Completed16.03.2009
OperatorStatoilHydro Petroleum AS
Position61,4041 N, 2,5806 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Visund gradient | 39,6 °C/km |
| Estimated at total depth from the gradient | 13 °C |
The gradient is the median of 12 released wells in Visund with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/8-13 A | 0,0 | 3 852,0 | - | 1,61 | 2009 |
| 34/8-13 S | 0,0 | 4 442,0 | - | 1,61 | 2009 |
| 34/8-3 | 1,9 | 3 328,0 | 122 °C | 1,70 | 1988 |
| 34/8-3 A | 1,9 | 3 230,0 | 116 °C | 1,71 | 1988 |
| 34/8-B-1 AH | 3,0 | 5 405,0 | - | - | 2002 |
| 34/8-B-1 H | 3,0 | 3 280,0 | - | - | 1999 |
| 34/8-B-2 H | 3,1 | 4 880,0 | - | - | 2001 |
| 34/8-17 S | 3,5 | 4 587,0 | - | 1,78 | 2014 |
Casing and formation tests
No casing programme is reported for this wellbore.