Fields / Njord / 6407/7-1 S
6407/7-1 S
Exploration, wildcatPlugged and abandonedOil and gas
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Njord, 19.10.1985 to 07.04.1986 (170 days), to 3 950,0 m in the Red Beds (informal).
Water depth328,0 m
Total depth3 950,0 m MD
Vertical depth3 925,0 m TVD
Bottom-hole temperature138 °C
Max inclination9,8°
Rotary table23,0 m
Formation at total depthRed Beds (informal)
RigPolar Pioneer
Spud19.10.1985
Completed07.04.1986
OperatorNorsk Hydro Produksjon AS
Position64,2754 N, 7,2059 E
Formations
19 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 138 °C |
| Njord gradient | 40,5 °C/km |
| Estimated at total depth from the gradient | 149 °C |
The gradient is the median of 8 released wells in Njord with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 6407/7-A-24 H | 0,5 | 4 731,0 | - | - | 2024 |
| 6407/7-A-20 AY1H | 0,5 | - | - | - | - |
| 6407/7-A-20 AY2H | 0,5 | - | - | - | - |
| 6407/7-A-20 H | 0,5 | 4 050,7 | - | - | 2013 |
| 6407/7-A-21 H | 0,5 | - | - | - | 2026 |
| 6407/7-A-19 AH | 0,5 | 4 087,0 | - | - | 2009 |
| 6407/7-A-19 H | 0,5 | 3 464,0 | - | - | 2009 |
| 6407/7-A-16 H | 0,5 | 4 418,0 | - | - | 1998 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 441,0 | 36" | 443,0 | - |
| Surface casing | 20" | 1 130,0 | 26" | 1 172,0 | - |
| Intermediate | 13 3/8" | 1 890,0 | 17 1/2" | 1 917,0 | - |
| Intermediate | 9 5/8" | 2 700,0 | 12 1/4" | 2 710,0 | - |
| Intermediate | 7" | 3 729,0 | 8 3/8" | 3 756,0 | - |
| Open hole | - | 3 950,0 | 6" | 3 950,0 | - |
Mud weight
135 measurements, one dot each, 1,00 to 1,71 g/cm³ against measured depth, brine, water based, xxx, xxxx.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 5 | 2 758,0 - 2 781,0 | 25,4 | - | - | 221 | 170 000 |
| 4 | 2 840,0 - 2 886,0 | 12,7 | - | - | 204 | 148 000 |
| 3 | 2 946,5 - 2 973,0 | 12,7 | - | - | 210 | 147 000 |
| 2 | 3 022,9 - 3 034,4 | 25,4 | - | - | 85 | 19 000 |
| 1 | 3 099,5 - 3 113,5 | 25,4 | - | - | - | - |