Seismic / 2023
Seismic surveys in 2023
105 surveys in the register for 2023: 53 site surveys, 19 soil surveys, 13 4D seabed seismic surveys, 8 3D seismic surveys, 2 3D seabed seismic surveys, 2 4D seismic surveys and 1 2D seabed seismic survey started. 7 were cancelled.
12D seismic
103D seismic
154D seismic
23 976km² of 3D and 4D seismic acquired
Every survey
By start date, or the planned start for a survey that did not start. The year is the start year.
| Survey | Status | Type | Area | For company | Started | Completed | Net area, km² |
|---|---|---|---|---|---|---|---|
| HAR23300 | Completed | Site survey | North Sea | Chrysaor Norge AS | 09.02.2023 | 03.03.2023 | 25 |
| ABP23300 | Cancelled | Site survey | Barents Sea | ABP Norway AS | - | - | - |
| ABP23304 | Completed | Site survey | Barents Sea | Aker BP ASA | 17.02.2023 | 20.02.2023 | - |
| ABP23301 | Completed | Site survey | Norwegian Sea | Aker BP ASA | 11.03.2023 | 22.03.2023 | - |
| VE23300 | Completed | Site survey | Barents Sea | Vår Energi ASA | 11.03.2023 | 30.03.2023 | - |
| EQ23100 | Completed | Soil survey | North Sea | Equinor Energy AS | 12.03.2023 | 05.04.2023 | - |
| ABP23305 | Completed | Site survey | North Sea | Aker BP ASA | 17.03.2023 | 19.04.2023 | 3 |
| ABP23307 | Completed | Site survey | North Sea | Aker BP ASA | 23.03.2023 | 05.04.2023 | - |
| ABP23306 | Completed | Site survey | North Sea | Aker BP ASA | 27.03.2023 | 29.03.2023 | - |
| ABP23200 | Completed | 4D seabed seismic | North Sea | Aker BP ASA | 30.03.2023 | 24.04.2023 | 74 |
| ABP23101 | Completed | Soil survey | North Sea | Aker BP ASA | 03.04.2023 | 04.04.2023 | - |
| CGG23001 | Completed | 3D seismic | Norwegian Sea | CGG Services (Norway) AS | 06.04.2023 | 15.06.2023 | 2 637 |
| EQ23101 | Completed | Soil survey | North Sea | Equinor Energy AS | 06.04.2023 | 18.04.2023 | - |
| ABP23102 | Completed | Soil survey | North Sea | Aker BP ASA | 08.04.2023 | 16.04.2023 | - |
| OKEA23300 | Completed | Site survey | Norwegian Sea | OKEA ASA | 08.04.2023 | 11.04.2023 | 16 |
| PGS23001 | Completed | 3D seismic | Norwegian Sea | Multiklient Invest AS | 12.04.2023 | 20.09.2023 | 7 944 |
| TGS23202 | Completed | 3D seabed seismic | North Sea | TGS ASA | 14.04.2023 | 15.06.2023 | 420 |
| ABP23100 | Cancelled | Soil survey | North Sea | Aker BP ASA | - | - | - |
| ABP23103 | Completed | Soil survey | North Sea | Aker BP ASA | 18.04.2023 | 21.04.2023 | - |
| ABP23302 | Completed | Site survey | Norwegian Sea | Aker BP ASA | 18.04.2023 | 21.04.2023 | - |
| CP23200 | Completed | 4D seabed seismic | North Sea | ConocoPhillips Skandinavia AS | 23.04.2023 | 05.06.2023 | - |
| ABP23104 | Completed | Soil survey | North Sea | Aker BP ASA | 24.04.2023 | 25.04.2023 | - |
| ABP23303 | Completed | Site survey | North Sea | Aker BP ASA | 27.04.2023 | 07.06.2023 | 1 |
| TOEN23100 | Completed | Soil survey | North Sea | TotalEnergies EP Norge AS | 27.04.2023 | 10.05.2023 | - |
| NPD23100 | Completed | Soil survey | North Sea | Oljedirektoratet | 28.04.2023 | 09.07.2023 | - |
| EQ23200 | Completed | 4D seabed seismic | North Sea | Equinor Energy AS | 01.05.2023 | 01.06.2023 | 385 |
| NEP23300 | Completed | Site survey | Norwegian Sea | Neptune Energy Norge AS | 01.05.2023 | 06.05.2023 | 16 |
| EQ23305 | Completed | Site survey | North Sea | Equinor Energy AS | 02.05.2023 | 23.05.2023 | 49 |
| EQ23303 | Completed | Site survey | North Sea | Equinor Energy AS | 03.05.2023 | 13.05.2023 | 4 |
| SE23100 | Completed | Soil survey | North Sea | Sval Energi AS | 10.05.2023 | 12.05.2023 | 1 |
| VE23301 | Completed | Site survey | Barents Sea | Vår Energi ASA | 10.05.2023 | 17.05.2023 | - |
| EQ23201 | Completed | 4D seabed seismic | North Sea | Equinor Energy AS | 12.05.2023 | 28.05.2023 | 141 |
| HAR23100 | Completed | Soil survey | North Sea | Harbour Energy Norge AS (Old) | 12.05.2023 | 14.05.2023 | 1 |
| EQ23307 | Completed | Site survey | North Sea | Equinor Energy AS | 13.05.2023 | 23.06.2023 | 22 |
| VE23001 | Completed | 3D seismic | Barents Sea | Vår Energi ASA | 16.05.2023 | 29.06.2023 | 1 249 |
| ABP23106 | Cancelled | Soil survey | North Sea | Aker BP ASA | - | - | - |
| EQ23203 | Completed | 4D seabed seismic | North Sea | Equinor Energy AS | 18.05.2023 | 27.06.2023 | - |
| EQ23311 | Completed | Site survey | North Sea | Equinor Energy AS | 18.05.2023 | 08.06.2023 | 38 |
| WD23302 | Completed | Site survey | North Sea | Wintershall Dea Norge AS | 19.05.2023 | 02.06.2023 | 1 |
| ABP23105 | Completed | Soil survey | North Sea | Aker BP ASA | 22.05.2023 | 29.05.2023 | - |
| WD23300 | Cancelled | Site survey | - | Wintershall Dea Norge AS | - | - | - |
| CP23201 | Completed | 4D seabed seismic | North Sea | ConocoPhillips Skandinavia AS | 26.05.2023 | 31.07.2023 | - |
| CGG23003 | Completed | 3D seismic | North Sea | CGG Services (Norway) AS | 29.05.2023 | 15.06.2023 | 172 |
| CGG23002 | Cancelled | 3D seismic | Norwegian Sea | CGG Services (Norway) AS | - | - | - |
| ABP23107 | Completed | Soil survey | North Sea | Aker BP ASA | 01.06.2023 | 15.06.2023 | - |
| TGS23200 | Cancelled | 3D seabed seismic | North Sea | TGS ASA | - | - | - |
| WD23301 | Completed | Site survey | North Sea | Wintershall Dea Norge AS | 02.06.2023 | 07.06.2023 | - |
| EQ23001 | Completed | 4D seismic | North Sea | Equinor Energy AS | 03.06.2023 | 07.07.2023 | 719 |
| EQ23300 | Completed | Site survey | Norwegian Sea | Equinor Energy AS | 06.06.2023 | 22.06.2023 | 49 |
| NL23300 | Completed | Site survey | North Sea | Northern Lights JV DA | 08.06.2023 | 20.06.2023 | 57 |
| VE23302 | Completed | Site survey | Norwegian Sea | Vår Energi ASA | 08.06.2023 | 15.06.2023 | - |
| TGS23201 | Completed | 3D seabed seismic | North Sea | TGS ASA | 12.06.2023 | 14.09.2023 | 1 208 |
| ABP23310 | Completed | Site survey | North Sea | Aker BP ASA | 16.06.2023 | 25.06.2023 | - |
| EQ23301 | Completed | Site survey | North Sea | Equinor ASA | 20.06.2023 | 30.06.2023 | 81 |
| EQ23308 | Completed | Site survey | Norwegian Sea | Equinor Energy AS | 21.06.2023 | 18.07.2023 | - |
| NPD23102 | Completed | Soil survey | Barents Sea | Oljedirektoratet | 21.06.2023 | 29.09.2023 | - |
| EQ23309 | Completed | Site survey | North Sea | Equinor Energy AS | 23.06.2023 | 12.07.2023 | 16 |
| ABP23308 | Completed | Site survey | North Sea | Aker BP ASA | 25.06.2023 | 29.06.2023 | - |
| PGS23002 | Completed | 3D seismic | Norwegian Sea | Multiklient Invest AS | 26.06.2023 | 20.09.2023 | 4 955 |
| NPD23101 | Completed | Soil survey | North Sea | Oljedirektoratet | 27.06.2023 | 08.08.2023 | - |
| ABP23309 | Completed | Site survey | North Sea | Aker BP ASA | 30.06.2023 | 16.07.2023 | - |
| EQ23302 | Completed | Site survey | North Sea | Equinor ASA | 30.06.2023 | 13.07.2023 | 72 |
| EQ23204 | Completed | 4D seabed seismic | North Sea | Equinor Energy AS | 01.07.2023 | 25.07.2023 | - |
| EQ23314 | Completed | Site survey | North Sea | Equinor Energy AS | 12.07.2023 | 17.08.2023 | 19 |
| EQ23315 | Completed | Site survey | North Sea | Equinor Energy AS | 13.07.2023 | 23.07.2023 | 27 |
| EQ23316 | Completed | Site survey | Norwegian Sea | Equinor Energy AS | 18.07.2023 | 21.07.2023 | - |
| EQ23002 | Completed | 4D seismic | North Sea | Equinor Energy AS | 20.07.2023 | 18.09.2023 | 2 344 |
| EQ23312 | Completed | Site survey | North Sea | Equinor Energy AS | 21.07.2023 | 01.08.2023 | 49 |
| EQ23317 | Completed | Site survey | North Sea | Equinor Energy AS | 25.07.2023 | 28.07.2023 | - |
| DNO23300 | Completed | Site survey | North Sea | DNO Norge AS (old) | 26.07.2023 | 03.08.2023 | - |
| ABP23201 | Completed | 4D seabed seismic | North Sea | Aker BP ASA | 28.07.2023 | 07.09.2023 | - |
| EQ23313 | Completed | Site survey | North Sea | Equinor Energy AS | 28.07.2023 | 29.07.2023 | - |
| OMV23001 | Completed | 3D seismic | Norwegian Sea | OMV (Norge) AS | 28.07.2023 | 20.10.2023 | 1 137 |
| EQ23322 | Completed | Site survey | North Sea | Equinor Energy AS | 31.07.2023 | 13.08.2023 | - |
| DNO23301 | Completed | Site survey | North Sea | DNO Norge AS (old) | 04.08.2023 | 19.08.2023 | - |
| VE23303 | Completed | Site survey | North Sea | Vår Energi ASA | 05.08.2023 | 14.08.2023 | - |
| EQ23310 | Completed | Site survey | North Sea | Equinor Energy AS | 14.08.2023 | 26.08.2023 | 7 |
| CP23300 | Completed | Site survey | Norwegian Sea | ConocoPhillips Skandinavia AS | 20.08.2023 | 28.08.2023 | - |
| EQ23202 | Completed | 4D seabed seismic | North Sea | Equinor Energy AS | 21.08.2023 | 19.09.2023 | 309 |
| CP23301 | Completed | Site survey | Norwegian Sea | ConocoPhillips Skandinavia AS | 22.08.2023 | 28.08.2023 | - |
| ABP23202 | Completed | 2D seabed seismic | North Sea | Aker BP ASA | 26.08.2023 | 04.09.2023 | - |
| EQ23319 | Completed | Site survey | North Sea | Equinor Energy AS | 26.08.2023 | 28.10.2023 | 37 |
| CP23302 | Completed | Site survey | Norwegian Sea | ConocoPhillips Skandinavia AS | 28.08.2023 | 03.09.2023 | - |
| ABP23110 | Completed | Soil survey | North Sea | Aker BP ASA | 31.08.2023 | 11.09.2023 | - |
| ABP23001 | Completed | 3D seismic | North Sea | Aker BP ASA | 02.09.2023 | 26.09.2023 | - |
| ABP23203 | Completed | 4D seabed seismic | North Sea | Aker BP ASA | 05.09.2023 | 17.09.2023 | - |
| EQ23205 | Completed | 4D seabed seismic | North Sea | Equinor Energy AS | 05.09.2023 | 06.10.2023 | - |
| ABP23108 | Completed | Soil survey | Norwegian Sea | Aker BP ASA | 06.09.2023 | 07.09.2023 | - |
| ABP23109 | Completed | Soil survey | Norwegian Sea | Aker BP ASA | 07.09.2023 | 08.09.2023 | - |
| CP23202 | Completed | 4D seabed seismic | North Sea | ConocoPhillips Skandinavia AS | 11.09.2023 | 20.11.2023 | 141 |
| EQ23318 | Completed | Site survey | North Sea | Equinor Energy AS | 11.09.2023 | 19.10.2023 | 2 |
| EQ23102 | Completed | Soil survey | North Sea | Equinor Energy AS | 12.09.2023 | 14.10.2023 | - |
| EQ23306 | Completed | Site survey | North Sea | Equinor Energy AS | 16.09.2023 | 08.11.2023 | 63 |
| EQ23320 | Completed | Site survey | North Sea | Equinor Energy AS | 16.09.2023 | 30.10.2023 | 14 |
| EQ23206 | Completed | 4D seabed seismic | North Sea | Equinor Energy AS | 19.09.2023 | 05.10.2023 | 141 |
| DNO23302 | Completed | Site survey | North Sea | DNO Norge AS (old) | 25.09.2023 | 07.10.2023 | - |
| PGS23003 | Completed | 3D seismic | North Sea | Multiklient Invest AS | 26.09.2023 | 11.10.2023 | - |
| WP23300 | Completed | Site survey | North Sea | Wellesley Petroleum AS | 18.10.2023 | 29.10.2023 | - |
| EQ23321 | Completed | Site survey | North Sea | Equinor Energy AS | 19.10.2023 | 13.12.2023 | 24 |
| NPD23103 | Completed | Soil survey | Barents Sea | Oljedirektoratet | 30.10.2023 | 31.10.2023 | - |
| OMV23300 | Completed | Site survey | Norwegian Sea | OMV (Norge) AS | 01.11.2023 | 07.11.2023 | - |
| WD23303 | Completed | Site survey | North Sea | Wintershall Dea Norge AS | 15.11.2023 | 02.12.2023 | - |
| WP23301 | Completed | Site survey | North Sea | Wellesley Petroleum AS | 04.12.2023 | 14.12.2023 | - |
| EQ23003 | Cancelled | Other survey | Barents Sea | Equinor Energy AS | - | - | - |
| OKEA23301 | Completed | Site survey | North Sea | OKEA ASA | 22.12.2023 | 31.12.2023 | - |