Rigs / Brage
Brage
Steel jacketPlatformNot drilling
A steel jacket platform with eight legs named on 124 wellbores in the register, spudded 1993 to 2025, for 7 operators.
New wellbores drilled by Brage
One email when a new wellbore drilled by Brage appears in the register, usually a few days after it is spudded. Free. Leave with one click.
124Wellbores
0Spudded in the last 12 months
7Operators
25.10.2025Latest spud
Wellbores spudded per year
Development and otherExploration
Days drilling per year
Days drilling counts each calendar day from a wellbore's spud to its completion in the register, once per day however many wellbores were open, in the year the day falls in. Development wellbores drilled in batches can stay open for years between the top hole and completion, so a platform's days can run high.
Operators
| Operator | Wellbores | First year | Latest spud |
|---|---|---|---|
| Norsk Hydro Produksjon AS | 58 | 1993 | 05.12.2006 |
| OKEA ASA | 17 | 2022 | 25.10.2025 |
| Wintershall Norge AS | 15 | 2014 | 12.11.2019 |
| Statoil Petroleum AS | 14 | 2009 | 18.12.2011 |
| Wintershall Dea Norge AS | 10 | 2020 | 10.06.2022 |
| StatoilHydro Petroleum AS | 6 | 2007 | 23.08.2009 |
| Norsk Hydro Petroleum AS | 4 | 2007 | 07.09.2007 |
Fields
| Field | Wellbores | First year | Latest spud |
|---|---|---|---|
| Brage | 122 | 1993 | 25.10.2025 |
Every wellbore drilled with Brage
124 wellbores, newest spud first. Days are spud to completion.
| Wellbore | Field | Operator | Type | Status | Total depth, m | Spud | Completed | Days |
|---|---|---|---|---|---|---|---|---|
| 31/4-A-15 D | Brage | OKEA ASA | Development | Producing | 10 009,0 | 25.10.2025 | 26.11.2025 | 32 |
| 31/4-A-15 C | Brage | OKEA ASA | Development | Plugged | 10 895,0 | 08.09.2025 | 28.09.2025 | 20 |
| 31/4-A-15 B | Brage | OKEA ASA | Exploration | Plugged | 10 223,0 | 07.07.2025 | 07.09.2025 | 62 |
| 31/4-A-23 H | Brage | OKEA ASA | Development | Producing | 9 646,0 | 12.04.2025 | 03.05.2025 | 21 |
| 31/4-A-23 G | Brage | OKEA ASA | Exploration | Plugged | 10 023,0 | 10.01.2025 | 11.04.2025 | 91 |
| 31/4-A-23 F | - | OKEA ASA | Exploration | Plugged | 6 285,0 | 15.11.2024 | 08.01.2025 | 54 |
| 31/4-A-28 D | Brage | OKEA ASA | Development | Producing | 8 787,0 | 14.06.2024 | 29.06.2024 | 15 |
| 31/4-A-28 C | Brage | OKEA ASA | Development | Plugged | 5 555,0 | 18.05.2024 | 12.06.2024 | 25 |
| 31/4-A-21 A | Brage | OKEA ASA | Development | Producing | 6 501,0 | 14.02.2024 | 25.03.2024 | 40 |
| 31/4-A-40 C | Brage | OKEA ASA | Development | Injecting | 9 247,0 | 19.10.2023 | 17.12.2023 | 59 |
| 31/4-A-30 C | Brage | OKEA ASA | Development | Producing | 5 030,0 | 07.09.2023 | 09.10.2023 | 32 |
| 31/4-A-13 F | Brage | OKEA ASA | Development | Producing | 7 571,0 | 02.07.2023 | 27.07.2023 | 25 |
| 31/4-A-13 E | Brage | OKEA ASA | Development | Plugged | 9 050,0 | 28.06.2023 | 12.07.2023 | 14 |
| 31/4-A-13 D | Brage | OKEA ASA | Development | Closed | 8 501,0 | 20.06.2023 | 28.06.2023 | 8 |
| 31/4-A-37 C | Brage | OKEA ASA | Development | Producing | 7 892,0 | 13.03.2023 | 06.06.2023 | 85 |
| 31/4-A-11 E | Brage | OKEA ASA | Development | Producing | 8 400,0 | 08.01.2023 | 21.02.2023 | 44 |
| 31/4-A-11 D | Brage | OKEA ASA | Development | Plugged | 6 749,0 | 08.12.2022 | 05.01.2023 | 28 |
| 31/4-A-13 C | - | Wintershall Dea Norge AS | Exploration | Plugged | 7 799,0 | 10.06.2022 | 26.07.2022 | 46 |
| 31/4-A-26 B | Brage | Wintershall Dea Norge AS | Development | Plugged | 4 270,0 | 26.03.2022 | 04.04.2022 | 9 |
| 31/4-A-26 A | Brage | Wintershall Dea Norge AS | Development | Plugged | 4 790,0 | 26.02.2022 | 23.03.2022 | 25 |
| 31/4-A-32 D | Brage | Wintershall Dea Norge AS | Development | Closed | 6 400,0 | 15.12.2021 | 19.01.2022 | 35 |
| 31/4-A-35 B | Brage | Wintershall Dea Norge AS | Development | Producing | 8 102,0 | 04.10.2021 | 25.11.2021 | 52 |
| 31/4-A-1 D | Brage | Wintershall Dea Norge AS | Development | Producing | 6 574,0 | 31.07.2021 | 10.09.2021 | 41 |
| 31/4-A-1 C | Brage | Wintershall Dea Norge AS | Development | Plugged | 8 020,0 | 20.07.2021 | 30.07.2021 | 10 |
| 31/4-A-1 B | Brage | Wintershall Dea Norge AS | Development | Plugged | 7 661,0 | 21.06.2021 | 20.07.2021 | 29 |
| 31/4-A-12 C | Brage | Wintershall Dea Norge AS | Development | Producing | 6 774,0 | 31.01.2020 | 23.02.2020 | 23 |
| 31/4-A-12 B | Brage | Wintershall Dea Norge AS | Development | Plugged | 4 545,0 | 02.01.2020 | 29.01.2020 | 27 |
| 31/4-A-36 B | Brage | Wintershall Norge AS | Development | Closed | 9 023,0 | 12.11.2019 | 28.11.2019 | 16 |
| 31/4-A-36 A | Brage | Wintershall Norge AS | Development | Plugged | 8 253,0 | 27.07.2019 | 10.11.2019 | 106 |
| 31/4-A-27 A | Brage | Wintershall Norge AS | Development | Producing | 6 073,0 | 29.03.2019 | 02.05.2019 | 34 |
| 31/4-A-15 A | Brage | Wintershall Norge AS | Development | Plugged | 8 466,0 | 24.10.2018 | 25.01.2019 | 93 |
| 31/4-A-8 B | Brage | Wintershall Norge AS | Development | Producing | 5 868,0 | 30.01.2018 | 05.02.2018 | 6 |
| 31/4-A-6 A | Brage | Wintershall Norge AS | Development | Injecting | 4 665,0 | 25.12.2017 | 09.01.2018 | 15 |
| 31/4-A-23 E | Brage | Wintershall Norge AS | Development | Plugged | 6 504,0 | 28.10.2017 | 04.12.2017 | 37 |
| 31/4-A-2 A | Brage | Wintershall Norge AS | Development | Injecting | 4 959,0 | 12.09.2017 | 28.09.2017 | 16 |
| 31/4-A-25 A | Brage | Wintershall Norge AS | Development | Producing | 5 645,0 | 10.07.2017 | 26.08.2017 | 47 |
| 31/4-A-7 B | Brage | Wintershall Norge AS | Development | Producing | 6 601,0 | 28.11.2015 | 07.12.2015 | 9 |
| 31/4-A-7 A | Brage | Wintershall Norge AS | Development | Plugged | 6 842,0 | 19.05.2015 | 27.11.2015 | 192 |
| 31/4-A-18 C | Brage | Wintershall Norge AS | Development | Closed | 6 611,0 | 13.04.2015 | 27.04.2015 | 14 |
| 31/4-A-18 B | Brage | Wintershall Norge AS | Development | Plugged | 6 058,0 | 31.03.2015 | 09.04.2015 | 9 |
| 31/4-A-18 A | Brage | Wintershall Norge AS | Development | Plugged | 5 270,0 | 08.12.2014 | 28.03.2015 | 110 |
| 31/4-A-23 D | Brage | Wintershall Norge AS | Development | Plugged | 7 193,0 | 19.01.2014 | 22.09.2014 | 246 |
| 31/4-A-23 C | Brage | Statoil Petroleum AS | Development | Plugged | 6 305,0 | 18.12.2011 | 05.10.2013 | 657 |
| 31/4-A-14 E | Brage | Statoil Petroleum AS | Development | Producing | 6 523,0 | 04.07.2011 | 14.08.2011 | 41 |
| 31/4-A-14 D | Brage | Statoil Petroleum AS | Development | Plugged | 8 940,0 | 03.04.2011 | 15.04.2011 | 12 |
| 31/4-A-14 C | Brage | Statoil Petroleum AS | Development | Plugged | 8 545,0 | 15.03.2011 | 27.03.2011 | 12 |
| 31/4-A-14 B | Brage | Statoil Petroleum AS | Development | Plugged | 6 262,0 | 06.03.2011 | 12.03.2011 | 6 |
| 31/4-A-14 A | Brage | Statoil Petroleum AS | Development | Plugged | 7 175,0 | 08.12.2010 | 21.02.2011 | 75 |
| 31/4-A-33 E | Brage | Statoil Petroleum AS | Development | Closed | 1 362,0 | 02.11.2010 | 24.11.2010 | 22 |
| 31/4-A-19 A | Brage | Statoil Petroleum AS | Development | Producing | 8 961,0 | 08.05.2010 | 09.08.2010 | 93 |
| 31/4-A-32 C | Brage | Statoil Petroleum AS | Development | Plugged | 5 600,0 | 20.03.2010 | 27.03.2010 | 7 |
| 31/4-A-32 B | Brage | Statoil Petroleum AS | Development | Plugged | 6 739,0 | 03.02.2010 | 18.03.2010 | 43 |
| 31/4-A-34 C | Brage | Statoil Petroleum AS | Development | Closed | 5 947,0 | 26.12.2009 | 05.01.2010 | 10 |
| 31/4-A-34 B | Brage | Statoil Petroleum AS | Development | Plugged | 5 618,0 | 20.12.2009 | 25.12.2009 | 5 |
| 31/4-A-34 A | Brage | Statoil Petroleum AS | Development | Plugged | 5 705,0 | 18.11.2009 | 19.12.2009 | 31 |
| 31/4-A-13 B | Brage | StatoilHydro Petroleum AS | Development | Plugged | 4 600,0 | 23.08.2009 | 12.09.2009 | 20 |
| 31/4-A-13 A | Brage | StatoilHydro Petroleum AS | Development | Plugged | 4 894,0 | 26.06.2009 | 21.08.2009 | 56 |
| 31/4-A-22 A | Brage | StatoilHydro Petroleum AS | Development | Closed | 8 727,0 | 10.02.2009 | 28.04.2009 | 77 |
| 31/4-A-1 A | Brage | StatoilHydro Petroleum AS | Development | Plugged | 7 143,0 | 21.07.2008 | 18.10.2008 | 89 |
| 31/4-A-35 A | Brage | StatoilHydro Petroleum AS | Development | Plugged | 6 760,0 | 21.02.2008 | 17.05.2008 | 86 |
| 31/4-A-28 B | Brage | StatoilHydro Petroleum AS | Development | Closed | 7 453,0 | 24.12.2007 | 11.01.2008 | 18 |
| 31/4-A-28 A | Brage | Norsk Hydro Petroleum AS | Development | Plugged | 6 895,0 | 07.09.2007 | 19.12.2007 | 103 |
| 31/4-A-40 B | Brage | Norsk Hydro Petroleum AS | Development | Closed | 6 844,0 | 22.07.2007 | 06.08.2007 | 15 |
| 31/4-A-40 A | Brage | Norsk Hydro Petroleum AS | Development | Plugged | 5 865,0 | 30.04.2007 | 17.07.2007 | 78 |
| 31/4-A-16 B | Brage | Norsk Hydro Petroleum AS | Development | Producing | 5 643,0 | 21.02.2007 | 02.03.2007 | 9 |
| 31/4-A-16 A | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 5 487,0 | 05.12.2006 | 18.02.2007 | 75 |
| 31/4-A-11 C | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 6 992,0 | 31.12.2004 | 05.03.2005 | 64 |
| 31/4-A-31 | Brage | Norsk Hydro Produksjon AS | Development | Closed | 8 116,0 | 28.04.2004 | 25.10.2004 | 180 |
| 31/4-A-30 B | Brage | Norsk Hydro Produksjon AS | Development | Closed | 5 313,0 | 14.02.2004 | 04.04.2004 | 50 |
| 31/4-A-17 BY3 | Brage | Norsk Hydro Produksjon AS | Development | Producing | 5 014,0 | 26.12.2003 | 12.01.2004 | 17 |
| 31/4-A-17 BY2 | Brage | Norsk Hydro Produksjon AS | Development | Producing | 3 865,0 | 15.12.2003 | 25.12.2003 | 10 |
| 31/4-A-17 BY1 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 3 426,0 | 06.11.2003 | 14.12.2003 | 38 |
| 31/4-A-24 A | Brage | Norsk Hydro Produksjon AS | Development | Producing | 1 002,0 | 03.09.2002 | 12.09.2002 | 9 |
| 31/4-A-29 A | Brage | Norsk Hydro Produksjon AS | Development | Producing | 997,0 | 15.08.2002 | 22.08.2002 | 7 |
| 31/4-A-11 B | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 4 785,0 | 27.05.2002 | 14.06.2002 | 18 |
| 31/4-A-33 D | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 4 384,0 | 27.03.2002 | 25.04.2002 | 29 |
| 31/4-A-33 C | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 4 355,0 | 16.03.2002 | 25.03.2002 | 9 |
| 31/4-A-33 B | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 3 401,0 | 03.02.2002 | 04.03.2002 | 29 |
| 31/4-A-10 A | Brage | Norsk Hydro Produksjon AS | Development | Closed | 6 120,0 | 16.11.2001 | 18.12.2001 | 32 |
| 31/4-A-10 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 4 949,0 | 21.08.2001 | 14.11.2001 | 85 |
| 31/4-A-22 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 6 890,0 | 13.04.2001 | 27.07.2001 | 105 |
| 31/4-A-23 B | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 3 156,0 | 31.03.2001 | 06.04.2001 | 6 |
| 31/4-A-23 A | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 2 738,0 | 08.03.2001 | 30.03.2001 | 22 |
| 31/4-A-39 | Brage | Norsk Hydro Produksjon AS | Development | Closed | 4 425,0 | 14.12.2000 | 25.01.2001 | 42 |
| 31/4-A-32 A | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 4 857,0 | 05.10.2000 | 17.10.2000 | 12 |
| 31/4-A-32 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 4 466,0 | 20.07.2000 | 15.09.2000 | 57 |
| 31/4-A-30 A | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 3 279,0 | 07.07.2000 | 13.07.2000 | 6 |
| 31/4-A-30 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 2 859,0 | 04.06.2000 | 04.07.2000 | 30 |
| 31/4-A-38 | Brage | Norsk Hydro Produksjon AS | Development | Closed | 4 094,0 | 29.01.1999 | 28.02.1999 | 30 |
| 31/4-A-33 A | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 5 713,0 | 07.12.1998 | 07.01.1999 | 31 |
| 31/4-A-33 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 4 227,0 | 26.10.1998 | 06.12.1998 | 41 |
| 31/4-A-34 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 5 783,0 | 01.09.1998 | 13.10.1998 | 42 |
| 31/4-A-35 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 3 862,0 | 25.07.1998 | 20.08.1998 | 26 |
| 31/4-A-36 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 4 663,0 | 06.06.1998 | 07.07.1998 | 31 |
| 31/4-A-20 | Brage | Norsk Hydro Produksjon AS | Development | Producing | 7 372,0 | 26.12.1997 | 28.04.1998 | 123 |
| 31/4-A-11 A | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 4 660,0 | 28.11.1997 | 15.12.1997 | 17 |
| 31/4-A-11 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 3 934,0 | 20.10.1997 | 27.11.1997 | 38 |
| 31/4-A-37 B | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 7 080,0 | 18.09.1997 | 29.09.1997 | 11 |
| 31/4-A-37 A | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 6 474,0 | 05.09.1997 | 16.09.1997 | 11 |
| 31/4-A-37 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 5 049,0 | 28.07.1997 | 03.09.1997 | 37 |
| 31/4-A-19 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 5 645,0 | 14.04.1997 | 15.05.1997 | 31 |
| 31/4-A-16 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 7 170,0 | 16.12.1996 | 01.03.1997 | 75 |
| 31/4-A-29 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 1 095,0 | 23.11.1996 | 29.11.1996 | 6 |
| 31/4-A-24 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 1 107,0 | 12.11.1996 | 20.11.1996 | 8 |
| 31/4-A-9 | Brage | Norsk Hydro Produksjon AS | Development | Producing | 6 602,0 | 25.06.1996 | 17.09.1996 | 84 |
| 31/4-A-15 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 4 397,0 | 10.05.1996 | 13.06.1996 | 34 |
| 31/4-A-17 A | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 5 541,0 | 04.04.1996 | 28.04.1996 | 24 |
| 31/4-A-17 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 3 985,0 | 03.02.1996 | 03.04.1996 | 60 |
| 31/4-A-40 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 5 822,0 | 06.11.1995 | 27.12.1995 | 51 |
| 31/4-A-27 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 4 296,0 | 19.09.1995 | 25.10.1995 | 36 |
| 31/4-A-28 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 5 778,0 | 16.03.1995 | 28.08.1995 | 165 |
| 31/4-A-21 | Brage | Norsk Hydro Produksjon AS | Development | Closed | 4 870,0 | 21.02.1995 | 21.04.1995 | 59 |
| 31/4-A-12 A | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 4 195,0 | 28.01.1995 | 10.02.1995 | 13 |
| 31/4-A-12 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 2 921,0 | 09.01.1995 | 27.01.1995 | 18 |
| 31/4-A-18 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 4 350,0 | 28.11.1994 | 01.01.1995 | 34 |
| 31/4-A-14 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 5 494,0 | 18.10.1994 | 23.11.1994 | 36 |
| 31/4-A-25 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 2 900,0 | 25.09.1994 | 11.10.1994 | 16 |
| 31/4-A-26 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 3 510,0 | 31.08.1994 | 20.09.1994 | 20 |
| 31/4-A-8 A | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 6 432,0 | 08.08.1994 | 20.08.1994 | 12 |
| 31/4-A-8 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 5 780,0 | 17.06.1994 | 06.08.1994 | 50 |
| 31/4-A-13 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 3 803,0 | 16.04.1994 | 04.06.1994 | 49 |
| 31/4-A-7 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 4 835,0 | 21.02.1994 | 10.04.1994 | 48 |
| 31/4-A-23 | Brage | Norsk Hydro Produksjon AS | Development | Plugged | 3 300,0 | 26.12.1993 | 11.02.1994 | 47 |
| 31/4-A-19 B | Brage | Statoil Petroleum AS | Development | Status not given | - | - | - | - |