Rigs / Transocean Winner
Transocean Winner
Semi-submersibleMobile rigNot drilling
A semi-submersible rig named on 111 wellbores in the register, spudded 1997 to 2016, for 15 operators.
New wellbores drilled by Transocean Winner
One email when a new wellbore drilled by Transocean Winner appears in the register, usually a few days after it is spudded. Free. Leave with one click.
111Wellbores
0Spudded in the last 12 months
15Operators
02.07.2016Latest spud
Wellbores spudded per year
Development and otherExploration
Days drilling per year
Days drilling counts each calendar day from a wellbore's spud to its completion in the register, once per day however many wellbores were open, in the year the day falls in. Development wellbores drilled in batches can stay open for years between the top hole and completion, so a platform's days can run high.
Operators
| Operator | Wellbores | First year | Latest spud |
|---|---|---|---|
| Den norske stats oljeselskap a.s | 30 | 1997 | 01.05.2001 |
| Det norske oljeselskap ASA | 17 | 2014 | 02.07.2016 |
| Marathon Oil Norge AS | 15 | 2012 | 19.07.2015 |
| Lundin Norway AS | 11 | 2009 | 11.02.2013 |
| StatoilHydro Petroleum AS | 9 | 2008 | 29.07.2009 |
| Marathon Petroleum Norge AS | 5 | 2009 | 22.02.2011 |
| Statoil ASA (old) | 5 | 2001 | 17.09.2001 |
| Norsk Hydro Petroleum AS | 4 | 2006 | 03.08.2007 |
| Talisman Energy Norge AS | 4 | 2008 | 31.05.2010 |
| A/S Norske Shell | 3 | 2001 | 09.05.2002 |
| StatoilHydro ASA | 3 | 2008 | 31.10.2008 |
| Norsk Hydro Produksjon AS | 2 | 2006 | 01.04.2007 |
| Maersk Oil Norway AS | 1 | 2011 | 09.11.2011 |
| Norske Conoco A/S | 1 | 2002 | 18.07.2002 |
| RWE Dea Norge AS | 1 | 2013 | 06.06.2013 |
Fields
| Field | Wellbores | First year | Latest spud |
|---|---|---|---|
| Åsgard | 34 | 1997 | 17.09.2001 |
| Alvheim | 21 | 2009 | 22.05.2016 |
| Bøyla | 6 | 2014 | 02.06.2014 |
| Volund | 4 | 2012 | 02.07.2016 |
| Johan Sverdrup | 3 | 2010 | 13.12.2012 |
| Draugen | 2 | 2002 | 09.05.2002 |
| Edvard Grieg | 2 | 2009 | 30.11.2009 |
| Gina Krog | 2 | 2008 | 09.09.2008 |
| Njord | 2 | 2007 | 03.08.2007 |
| Vilje | 2 | 2013 | 26.04.2013 |
| Byrding | 1 | 2006 | 23.08.2006 |
| Fram H-nord | 1 | 2007 | 01.04.2007 |
| Norne | 1 | 2001 | 11.06.2001 |
| Oseberg | 1 | 2008 | 13.03.2008 |
| Svalin | 1 | 2008 | 20.01.2008 |
Every wellbore drilled with Transocean Winner
111 wellbores, newest spud first. Days are spud to completion.
| Wellbore | Field | Operator | Type | Status | Total depth, m | Spud | Completed | Days |
|---|---|---|---|---|---|---|---|---|
| 24/9-P-9 H | Volund | Det norske oljeselskap ASA | Development | Closed | 4 616,0 | 02.07.2016 | 21.01.2017 | 203 |
| 24/9-P-10 H | Volund | Det norske oljeselskap ASA | Development | Plugged | 3 448,0 | 25.06.2016 | 19.12.2016 | 177 |
| 24/9-P-8 AY2H | Alvheim | Det norske oljeselskap ASA | Development | Producing | 5 114,0 | 22.05.2016 | 01.06.2016 | 10 |
| 24/9-P-8 AY1H | Alvheim | Det norske oljeselskap ASA | Development | Producing | 6 086,0 | 23.04.2016 | 21.05.2016 | 28 |
| 24/9-P-7 AH | Alvheim | Det norske oljeselskap ASA | Development | Producing | 4 658,0 | 10.03.2016 | 29.03.2016 | 19 |
| 24/9-P-8 H | Alvheim | Det norske oljeselskap ASA | Development | Plugged | 3 579,0 | 19.02.2016 | 22.04.2016 | 63 |
| 24/9-P-7 H | Alvheim | Det norske oljeselskap ASA | Development | Plugged | 3 248,0 | 05.02.2016 | 09.03.2016 | 33 |
| 24/6-A-5 CY3H | Alvheim | Det norske oljeselskap ASA | Development | Producing | 4 465,0 | 21.12.2015 | 02.01.2016 | 12 |
| 24/6-A-5 CY2H | Alvheim | Det norske oljeselskap ASA | Development | Producing | 5 245,0 | 26.11.2015 | 20.12.2015 | 24 |
| 24/6-A-5 CY1H | Alvheim | Det norske oljeselskap ASA | Development | Closed | 6 290,0 | 22.10.2015 | 25.11.2015 | 34 |
| 24/6-A-5 BH | Alvheim | Det norske oljeselskap ASA | Development | Plugged | 3 001,0 | 15.10.2015 | 21.10.2015 | 6 |
| 24/6-A-5 AH | Alvheim | Det norske oljeselskap ASA | Development | Plugged | 3 420,0 | 09.10.2015 | 14.10.2015 | 5 |
| 24/6-A-5 H | Alvheim | Det norske oljeselskap ASA | Development | Plugged | 2 870,0 | 20.09.2015 | 08.10.2015 | 18 |
| 25/4-K-6 BY2H | Alvheim | Marathon Oil Norge AS | Development | Closed | 5 938,0 | 19.07.2015 | 24.08.2015 | 36 |
| 25/4-K-6 BY1H | Alvheim | Det norske oljeselskap ASA | Development | Closed | 4 364,0 | 06.07.2015 | 18.07.2015 | 12 |
| 25/4-K-6 AH | Alvheim | Det norske oljeselskap ASA | Development | Plugged | 4 033,0 | 14.06.2015 | 02.07.2015 | 18 |
| 25/4-K-6 H | Alvheim | Det norske oljeselskap ASA | Development | Plugged | 3 125,0 | 19.05.2015 | 12.06.2015 | 24 |
| 25/4-L-4 H | Alvheim | Det norske oljeselskap ASA | Development | Producing | 4 547,0 | 19.10.2014 | 06.02.2015 | 110 |
| 24/9-M-3 AH | Bøyla | Marathon Oil Norge AS | Development | Injecting | 2 957,0 | 02.06.2014 | 17.08.2014 | 76 |
| 24/9-M-1 BH | Bøyla | Marathon Oil Norge AS | Development | Closed | 4 628,0 | 16.05.2014 | 23.06.2014 | 38 |
| 24/9-M-1 AH | Bøyla | Marathon Oil Norge AS | Development | Plugged | 2 727,0 | 11.05.2014 | 14.05.2014 | 3 |
| 24/9-M-2 H | Bøyla | Marathon Oil Norge AS | Development | Producing | 4 894,0 | 19.04.2014 | 17.03.2015 | 332 |
| 24/9-M-1 H | Bøyla | Marathon Oil Norge AS | Development | Plugged | 3 138,0 | 13.04.2014 | 10.05.2014 | 27 |
| 24/9-M-3 H | Bøyla | Marathon Oil Norge AS | Development | Plugged | 2 995,0 | 07.04.2014 | 01.06.2014 | 55 |
| 6608/2-1 S | - | RWE Dea Norge AS | Exploration | Plugged and abandoned | 5 634,0 | 06.06.2013 | 26.10.2013 | 142 |
| 25/4-F-1 AH | Vilje | Marathon Oil Norge AS | Development | Closed | 3 583,0 | 26.04.2013 | 15.03.2014 | 323 |
| 25/4-F-1 H | Vilje | Marathon Oil Norge AS | Development | Plugged | 2 850,0 | 26.03.2013 | 24.04.2013 | 29 |
| 16/1-17 | - | Lundin Norway AS | Exploration | Plugged and abandoned | 2 070,0 | 11.02.2013 | 20.03.2013 | 37 |
| 16/2-16 A | Johan Sverdrup | Lundin Norway AS | Exploration | Plugged and abandoned | 2 503,0 | 13.12.2012 | 07.02.2013 | 56 |
| 16/2-16 | Johan Sverdrup | Lundin Norway AS | Exploration | Plugged and abandoned | 2 214,0 | 11.11.2012 | 12.12.2012 | 31 |
| 24/9-P-6 AH | Volund | Marathon Oil Norge AS | Development | Closed | 4 475,0 | 04.10.2012 | 23.10.2012 | 19 |
| 24/9-P-6 H | Volund | Marathon Oil Norge AS | Development | Plugged | 3 115,0 | 08.09.2012 | 02.10.2012 | 24 |
| 24/6-B-5 AY3H | Alvheim | Marathon Oil Norge AS | Development | Closed | 5 654,0 | 12.07.2012 | 27.07.2012 | 15 |
| 24/6-B-5 AY2H | Alvheim | Marathon Oil Norge AS | Development | Closed | 5 268,0 | 29.05.2012 | 16.06.2012 | 18 |
| 24/6-B-5 AY1H | Alvheim | Marathon Oil Norge AS | Development | Closed | 4 977,0 | 01.05.2012 | 28.05.2012 | 27 |
| 24/6-B-5 H | Alvheim | Marathon Oil Norge AS | Development | Plugged | 3 343,0 | 01.04.2012 | 30.04.2012 | 29 |
| 6406/3-9 | - | Maersk Oil Norway AS | Exploration | Plugged and abandoned | 4 183,0 | 09.11.2011 | 26.03.2012 | 138 |
| 25/10-11 | - | Marathon Petroleum Norge AS | Exploration | Plugged and abandoned | 4 562,0 | 22.02.2011 | 10.08.2011 | 169 |
| 24/9-10 A | - | Marathon Petroleum Norge AS | Exploration | Plugged and abandoned | 2 900,0 | 03.02.2011 | 20.02.2011 | 17 |
| 24/9-10 S | - | Marathon Petroleum Norge AS | Exploration | Plugged and abandoned | 2 339,0 | 06.01.2011 | 02.02.2011 | 27 |
| 16/7-9 | - | Lundin Norway AS | Exploration | Plugged and abandoned | 2 665,0 | 05.12.2010 | 03.01.2011 | 29 |
| 16/1-14 | - | Lundin Norway AS | Exploration | Plugged and abandoned | 2 550,0 | 26.09.2010 | 30.11.2010 | 65 |
| 16/1-U-6 | - | Lundin Norway AS | Other | Plugged and abandoned | 606,0 | 24.09.2010 | 24.09.2010 | 0 |
| 16/2-6 | Johan Sverdrup | Lundin Norway AS | Exploration | Plugged and abandoned | 2 131,0 | 20.07.2010 | 20.09.2010 | 62 |
| 15/12-23 A | - | Talisman Energy Norge AS | Exploration | Plugged and abandoned | 4 772,0 | 31.05.2010 | 18.07.2010 | 48 |
| 15/12-23 | - | Talisman Energy Norge AS | Exploration | Plugged and abandoned | 3 485,0 | 01.04.2010 | 29.05.2010 | 58 |
| 9/2-11 | - | Talisman Energy Norge AS | Exploration | Plugged and abandoned | 2 861,0 | 09.03.2010 | 29.03.2010 | 20 |
| 16/4-5 | - | Lundin Norway AS | Exploration | Plugged and abandoned | 2 020,0 | 04.02.2010 | 07.03.2010 | 31 |
| 16/1-13 | Edvard Grieg | Lundin Norway AS | Exploration | Plugged and abandoned | 2 303,0 | 30.11.2009 | 21.01.2010 | 52 |
| 25/4-10 A | - | Marathon Petroleum Norge AS | Exploration | Plugged and abandoned | 2 550,0 | 11.11.2009 | 28.11.2009 | 17 |
| 25/4-10 S | Alvheim | Marathon Petroleum Norge AS | Exploration | Plugged and abandoned | 2 912,0 | 20.10.2009 | 10.11.2009 | 21 |
| 16/1-8 R | Edvard Grieg | Lundin Norway AS | Exploration | Plugged and abandoned | 2 201,0 | 02.10.2009 | 10.10.2009 | 8 |
| 25/5-6 | - | Lundin Norway AS | Exploration | Plugged and abandoned | 2 446,0 | 27.08.2009 | 19.09.2009 | 23 |
| 30/9-23 | - | StatoilHydro Petroleum AS | Exploration | Plugged and abandoned | 2 872,0 | 29.07.2009 | 21.08.2009 | 23 |
| 35/2-2 | - | StatoilHydro Petroleum AS | Exploration | Plugged and abandoned | 640,0 | 02.06.2009 | 26.07.2009 | 54 |
| 30/5-3 A | - | StatoilHydro Petroleum AS | Exploration | Plugged and abandoned | 4 746,0 | 15.04.2009 | 30.05.2009 | 45 |
| 30/5-3 S | - | StatoilHydro Petroleum AS | Exploration | Plugged and abandoned | 4 335,0 | 06.02.2009 | 12.04.2009 | 65 |
| 30/8-4 S | - | StatoilHydro Petroleum AS | Exploration | Plugged and abandoned | 4 210,0 | 29.11.2008 | 04.02.2009 | 67 |
| 6507/6-3 | - | StatoilHydro ASA | Exploration | Plugged and abandoned | 1 850,0 | 31.10.2008 | 24.11.2008 | 24 |
| 15/5-7 A | Gina Krog | StatoilHydro ASA | Exploration | Plugged and abandoned | 4 199,0 | 09.09.2008 | 13.10.2008 | 34 |
| 15/5-7 | Gina Krog | StatoilHydro ASA | Exploration | Plugged and abandoned | 4 037,0 | 04.07.2008 | 07.09.2008 | 65 |
| 32/2-1 | - | Talisman Energy Norge AS | Exploration | Plugged and abandoned | 1 300,0 | 18.06.2008 | 01.07.2008 | 13 |
| 30/9-21 A | - | StatoilHydro Petroleum AS | Exploration | Plugged and abandoned | 4 086,0 | 04.05.2008 | 15.06.2008 | 42 |
| 30/9-21 S | Oseberg | StatoilHydro Petroleum AS | Exploration | Plugged and abandoned | 4 090,0 | 13.03.2008 | 30.04.2008 | 48 |
| 25/11-25 A | - | StatoilHydro Petroleum AS | Exploration | Plugged and abandoned | 2 448,0 | 15.02.2008 | 10.03.2008 | 24 |
| 25/11-25 S | Svalin | StatoilHydro Petroleum AS | Exploration | Plugged and abandoned | 2 142,0 | 20.01.2008 | 15.02.2008 | 26 |
| 6407/7-7 S | Njord | Norsk Hydro Petroleum AS | Exploration | Plugged and abandoned | 3 886,0 | 03.08.2007 | 20.09.2007 | 48 |
| 6407/7-B-1 Y1H | Njord | Norsk Hydro Petroleum AS | Development | Suspended | - | 05.07.2007 | - | - |
| 35/11-15 S | Fram H-nord | Norsk Hydro Produksjon AS | Exploration | Plugged and abandoned | 3 250,0 | 01.04.2007 | 28.06.2007 | 88 |
| 25/11-24 | - | Norsk Hydro Petroleum AS | Exploration | Plugged and abandoned | 2 117,0 | 18.02.2007 | 29.03.2007 | 39 |
| 6507/11-7 | - | Norsk Hydro Produksjon AS | Exploration | Plugged and abandoned | 2 950,0 | 13.12.2006 | 12.02.2007 | 61 |
| 35/11-14 S | Byrding | Norsk Hydro Petroleum AS | Exploration | Plugged and abandoned | 3 306,0 | 23.08.2006 | 07.12.2006 | 106 |
| 34/6-1 S | - | Norske Conoco A/S | Exploration | Plugged and abandoned | 4 360,0 | 18.07.2002 | 28.08.2002 | 41 |
| 6407/9-E-2 H | Draugen | A/S Norske Shell | Development | Producing | 2 655,0 | 09.05.2002 | 10.06.2002 | 32 |
| 6407/9-E-1 H | Draugen | A/S Norske Shell | Development | Producing | 2 664,0 | 04.05.2002 | 28.06.2002 | 55 |
| 6406/5-1 | - | A/S Norske Shell | Exploration | Plugged and abandoned | 4 692,0 | 23.12.2001 | 30.04.2002 | 128 |
| 6506/12-M-2 H | Åsgard | Statoil ASA (old) | Development | Plugged | 5 218,0 | 17.09.2001 | 16.10.2001 | 29 |
| 6506/12-P-4 H | Åsgard | Statoil ASA (old) | Development | Plugged | 4 024,0 | 25.08.2001 | 12.09.2001 | 18 |
| 6506/12-H-4 H | Åsgard | Statoil ASA (old) | Development | Closed | 4 862,0 | 26.07.2001 | 18.08.2001 | 23 |
| 6407/2-Z-3 H | Åsgard | Statoil ASA (old) | Development | Closed | 3 400,0 | 09.07.2001 | 10.02.2002 | 216 |
| 6608/10-F-4 H | Norne | Statoil ASA (old) | Development | Plugged | 4 280,0 | 11.06.2001 | 03.07.2001 | 22 |
| 6506/12-N-3 H | Åsgard | Den norske stats oljeselskap a.s | Development | Plugged | 4 996,0 | 01.05.2001 | 03.06.2001 | 33 |
| 6506/12-S-4 AH | Åsgard | Den norske stats oljeselskap a.s | Development | Plugged | 5 690,0 | 14.04.2001 | 27.04.2001 | 13 |
| 6506/12-S-4 H | Åsgard | Den norske stats oljeselskap a.s | Development | Plugged | 5 483,0 | 25.02.2001 | 12.04.2001 | 46 |
| 6506/12-M-1 H | Åsgard | Den norske stats oljeselskap a.s | Development | Plugged | 5 065,0 | 19.01.2001 | 12.02.2001 | 24 |
| 6506/12-J-4 H | Åsgard | Den norske stats oljeselskap a.s | Development | Producing | 5 522,0 | 09.12.2000 | 10.01.2001 | 32 |
| 6506/12-H-3 H | Åsgard | Den norske stats oljeselskap a.s | Development | Plugged | 5 217,0 | 16.09.2000 | 26.10.2000 | 40 |
| 6506/12-H-1 H | Åsgard | Den norske stats oljeselskap a.s | Development | Producing | 5 728,0 | 14.09.2000 | 30.11.2000 | 77 |
| 6506/11-E-3 H | Åsgard | Den norske stats oljeselskap a.s | Development | Closed | 5 893,0 | 18.07.2000 | 04.09.2000 | 48 |
| 6507/11-X-4 AH | Åsgard | Den norske stats oljeselskap a.s | Development | Closed | 3 942,0 | 17.06.2000 | 10.02.2001 | 238 |
| 6506/12-M-3 H | Åsgard | Den norske stats oljeselskap a.s | Development | Closed | 6 780,0 | 10.04.2000 | 06.06.2000 | 57 |
| 6507/11-X-4 H | Åsgard | Den norske stats oljeselskap a.s | Development | Junked | 3 284,0 | 09.01.2000 | 16.03.2000 | 67 |
| 6507/11-X-3 H | Åsgard | Den norske stats oljeselskap a.s | Development | Closed | 4 408,0 | 06.01.2000 | 09.07.2000 | 185 |
| 6507/11-X-2 H | Åsgard | Den norske stats oljeselskap a.s | Development | Closed | 2 750,0 | 05.01.2000 | 05.04.2000 | 91 |
| 6507/11-X-1 H | Åsgard | Den norske stats oljeselskap a.s | Development | Closed | 3 527,0 | 07.12.1999 | 11.04.2000 | 126 |
| 6507/11-Y-4 H | Åsgard | Den norske stats oljeselskap a.s | Development | Producing | 2 447,0 | 15.11.1999 | 01.01.2000 | 47 |
| 6506/12-J-3 H | Åsgard | Den norske stats oljeselskap a.s | Development | Producing | 5 126,0 | 24.09.1999 | 28.10.1999 | 34 |
| 6506/12-J-2 H | Åsgard | Den norske stats oljeselskap a.s | Development | Closed | 4 515,0 | 22.08.1999 | 21.09.1999 | 30 |
| 6506/11-F-2 H | Åsgard | Den norske stats oljeselskap a.s | Development | Plugged | 5 366,0 | 07.06.1999 | 28.07.1999 | 51 |
| 6506/12-I-2 H | Åsgard | Den norske stats oljeselskap a.s | Development | Plugged | 5 140,0 | 09.04.1999 | 12.05.1999 | 33 |
| 6506/12-L-2 AH | Åsgard | Den norske stats oljeselskap a.s | Development | Producing | 5 811,0 | 02.03.1999 | 31.03.1999 | 29 |
| 6506/12-L-4 H | Åsgard | Den norske stats oljeselskap a.s | Development | Closed | 5 260,0 | 04.01.1999 | 22.02.1999 | 49 |
| 6506/12-P-1 H | Åsgard | Den norske stats oljeselskap a.s | Development | Plugged | 4 845,0 | 21.10.1998 | 20.11.1998 | 30 |
| 6507/11-Y-1 H | Åsgard | Den norske stats oljeselskap a.s | Development | Plugged | 2 783,0 | 08.09.1998 | 26.01.2000 | 505 |
| 6506/12-K-1 H | Åsgard | Den norske stats oljeselskap a.s | Development | Plugged | 5 208,0 | 25.07.1998 | 31.08.1998 | 37 |
| 6506/12-R-2 H | Åsgard | Den norske stats oljeselskap a.s | Development | Closed | 4 480,0 | 17.06.1998 | 19.07.1998 | 32 |
| 6506/12-S-2 H | Åsgard | Den norske stats oljeselskap a.s | Development | Closed | 5 850,0 | 08.04.1998 | 07.06.1998 | 60 |
| 6506/12-S-1 AH | Åsgard | Den norske stats oljeselskap a.s | Development | Producing | 5 600,0 | 02.01.1998 | 08.03.1998 | 65 |
| 6506/12-S-1 H | Åsgard | Den norske stats oljeselskap a.s | Development | Plugged | 4 990,0 | 02.11.1997 | 28.12.1997 | 56 |
| 6506/12-K-2 H | Åsgard | Den norske stats oljeselskap a.s | Development | Plugged | 6 003,0 | 21.08.1997 | 17.10.1997 | 57 |
| 6506/12-K-3 H | Åsgard | Den norske stats oljeselskap a.s | Development | Producing | 4 664,0 | 24.06.1997 | 17.08.1997 | 54 |